Fixing The Sewerage Crisis

  • Bringing together a Mission Critical Team to develop medium and long term plans and report back to Cabinet WITHIN 4 WEEKS for action and oversight.
  • Before the Report is presented, the BLP will manage and contain the problem by –
    • putting in place a strong sanitisation programme for the protection of public health.
    • finding points of blockage and leakage in the sewerage network and urgently fixing them with proven technologies and methods, while constructing an alternative outfall beyond the reef off the coast by Graeme Hall.
    • Taking steps to avoid a similar catastrophic failure at the Bridgetown plant.